Category: Prefabricated Pipe Bridges and Skids
Location: Detroit, MI
This Lane Additive Pre-Fabricated Process Pipe Skid is a metering, blending and top truck load-out-skid. It is equipped with (4) active 8” header lines (84, 91 single filter, Eth, 91 double filter) and (4) spare 8” headers. Bullard Company built this skid according to a design furnished by our client – a major petroleum company.
Included:
Total Weight = 25,000 lbs.
Products & Services Used: